Event Management

Versify Control of Work Permit to Work (PTW)

Permit to Work Software (PTW) for the Control of Work

Permit to Work Software for the Control of Work Versify's Mobile Control of Work software with integrated workflow and electronic forms, improves the effectiveness and procedural compliance of the general permit to work system and control of work…


Versify NERC Wind GADS Reporting NERC GADS Reporting

Versify’s Solutions meets NERC Wind GADS 2018 Q1 Submission

GLEN MILLS, Pennsylvania: Versify Solutions delivers automated NERC Wind GADS solution to meet the original mandatory NERC reporting deadline for Q1 of 2018.  Versify Solutions was one of the few companies to report on time with compliant reports .…


Versify Transmission Substation Swtiching Orders Isolation Points Switching Log

Transmission & Substations: Switching Orders and the Switching Log

Simplifying Switching Orders Procedure for the Energy & Utilities Industry With such high standards for safety and reliability, it has become critical for energy companies to automate and streamline operational procedures.  The days of paper…


Proper NERC Compliance Management is Essential for Your Business

NERC’s CIP standards are the plumb line for all electric and energy companies. Adhering to and complying with the rules and regulations of this body are non-negotiable requirements of doing business in the world of the bulk electric system. And…


Asking Yourself, “How Do I Demonstrate Internal Controls?” We Have The Solution

With over 90 NERC standards set in place for the energy industry, many companies are wondering, “How do I demonstrate internal controls?” NERC compliance requirements have been set in order to increase reliability for energy consumers, monitor and…


The Importance Of Automated Event Creation For Energy Entities

Automated event creation is a critical tool for data management for energy entities. By enlisting automated event creation, power entities ensure they do not miss any critical pieces of data, eliminate human error and ensure that their data is…


Why You Need A Dedicated Event Log Application

The North American Reliability Corporation (NERC) has over 90 Reliability Standards, including the Critical Infrastructure Protection (CIP) Standards. Compliance is mandatory. The only way to prove compliance is through comprehensive records that…


Versify Workflow Automation Digital Forms Electronic Forms

Why You Need Event Log Software

Energy companies need to remain compliant with the North American Electric Reliability Corporation Reliability Standards and Cyber Infrastructure Protection Standards. The key part of compliance is the ability to produce accurate event logs. In the…


Generation Event Logging and Timestamping

The North American Electric Reliability Corporation requires that power entities operating on North American Bulk Power Grid submit a generation event logging report with accurate timestamping as part of compliance efforts. These compliance efforts…


Automated Event Logging

The North American Electric Reliability Corporation requires automated event logging as part of Critical Asset Protection Standard 007 (CIP-007). All responsible entities which include generators, owners, operators, Regional Entities and…


Optimizing and Securing Your Automated Dispatch System

In the ever changing landscape of the power utility industry, companies are struggling with the demands of an increasingly complex interchange. Supply and demand has become especially more difficult to balance, and given the increasing popularity of…


Event Log Management Best Practices

Your event log management is the key part of maintaining compliance with the 90 NERC Reliability Practices. Versify Solutions has compiled event log management best practices to help guide your entity to accurate and efficient compliance logging.…